Nuie White Acrylic Square Shower Bath Front Panel 1700mm - WBS300

Code:
WBS300
/
views in last hours
£86.99RRP £146.00

Call for delivery lead time

Too long to wait? View similar products with next day delivery

Free Mainland Delivery* (Read full delivery info)

DECO Trust badge
  • Turn on embed
  • Create a DECO Trust badge from our app
  • Select a matching position
Manage Trust badge

DIMENSIONS

  • Length (Left to Right) 1700mm
  • Height 500mm
  • Depth (Top to Bottom) 167mm
  • Material Thickness 2mmmm

PRODUCT FEATURES

  • Style Contemporary
  • Colour White
  • Material Acrylic
  • Guarantee 5 Year manufacturers guarantee against manufacturing defects

Additional Information

  • For use with straight baths
  • Coordinating front and end panels
  • Manufactured from sanitary grade acrylic

Guarantee

5 Year manufacturers guarantee against manufacturing defects. The guarantee does not cover damage caused during fitting, or caused by poor installation or servicing, accidental or malicious damage, improper use or negligence, discoloration due to long exposure to sunlight or UV lights, and general wear and tear to the item and or working parts of the item (for example, the valve in a tap, shower heads, washers, seals, any item that would be expected to be replaced periodically during the life of the item). Any working part as stated above would be covered by a 6-month warranty unless stated longer. This warranty does not affect your statutory rights.

Contents

  • Bath Front Panel

About the Brand

Nuie is one of the most established names in the UK bathroom industry and truly is your home for bathrooms. Exceptional quality is a key factor contributing to Nuie's success, and they are also a proud member of the prestigious Made in Britain scheme. They are dedicated to bringing you the latest designs utilising the most up-to-date technology.

With an unsurpassed reputation for quality, the Nuie product range provides a thoroughly dependable design solution for any modern bathroom. The Nuie White Acrylic Square Shower Bath Front Panel 1700mm - WBS300 is manufactured to the highest standard. You should expect nothing less from a company with over two decades of manufacturing experience which has provided Ultra with extensive market knowledge and the ability to offer the most popular styles at affordable prices.

BrandNuie
Product TypeBath Panels
SKUWBS300
Height (mm)500mm
Made FromAcrylic
ColourWhite
Guarantee5 Year

5 Year manufacturer's guarantee against manufacturing defects. The guarantee does not cover damage caused during fitting, or caused by poor installation or servicing, accidental or malicious damage, improper use or negligence, discoloration due to long exposure to sunlight or UV lights, and general wear and tear to the item and or working parts of the item (for example, the valve in a tap, shower heads, washers, seals, any item that would be expected to be replaced periodically during the life of the item). Any working part as stated above would be covered by a 6-month warranty unless stated longer. This warranty does not affect your statutory rights.

You can find more detailed information directly on the manufacturer's website.

See out latest delivery charges on our delivery page

TAPS UK RETURNS INFORMATION

Purchasing online can have its own benefits such as competitive prices, wider range of products available but with all the research you may do for the product you are considering to purchase, there is always the unexpected mistake or the product just does not meet your expectation. Don't worry because at taps UK, you have 365 days to think about it with the option for refund within 30 days or return for credit note after 30 days, it's never been easier to take your time.

365 DAY RETURNS GUARANTEE - UNUSED PURCHASES

All unused items are covered by 30 day money back or 365 day returns guarantee. 

Products returned within 30 days of delivery will be issued with a full refund, less any special delivery costs associated with your initial delivery. Products returned within 365 days of delivery but over 30 days of delivery will attract a restocking charge of 25% and it will be deducted when the credit note is issued. The credit note is valid for 12 months and can be redeemed for all products or services provided by Taps UK. 

To qualify for our 30 day money back or 365 day returns guarantee, all you need to do is to follow our 3 simple steps below.

1. Contact our customer services within the correct time frame of delivery, by submitting your request for a return through our online help desk with the following information:

Name
Email address
Contact telephone number
Invoice/sales order number
Product detail of item returning
Reason for request to return

2. Print and complete the returns form with your unique returns reference number provided by our customer service on acknowledgement to your request.

3. Pack your items securely, including your returns form within, and return it to the address provided by our customer service. 

Polite Notice - We do not cover the return postage costs. Goods must be returned in their original packaging in a sellable condition.  Refund & Credit notes are issued within 14 days of return.


For more information on returns please click the link below.

Recently Viewed

We've got you covered

Free Delivery to Mainland UK

We cover most areas free of charge, for more information see our delivery page

365 day returns window

You can return anything you're not happy with for a fill refund within 30 days, or exchange for 365 read more

UK Company from the West Midlands

Our local team are on hand to help you with any questions you may have contact us

Trading Since 2005

With over 20 years experience, there isn't much we can't help you with!

Our customers think we're excellent!

With over 180.000 positive feedback on eBay, Amazon and our website, you can shop with confidence

Found it cheaper?

Get in touch with our team and we will beat the price contact us

Latest from the blog